I was called to this bathroom remodel
project because the homeowner was
unhappy with the way the
tile
installation was turning out by the
handyman he hired.    
(Pictures are below)

Unfortunately we had to remove all the
tile, wall board and
shower pan in
order to correct the installation and
waterproofing problems.
BATH REMODEL SHOWER INSTALLATION REDO

The bathroom remodel pictures with the arrows are pointing to some of the many
flaws with this bathroom tile job. Many of the tile edges at the shower corner, shower
curb and drain are sharp edges and or finished without using any trim tile.

The shower
floor tile installation was over the existing shower floor. Look closely at the
shower drain and you will see what I am talking about. The drain and shower pan were
never replaced so the tile remodeling contractor built an unusually high shower curb
about 9 inches in height.
The new bathroom remodel tile installation
which our tile installers set in a brick
pattern is a 12x12 limestone for the
shower walls. We installed the same glass
tile but widened the  
tile design and used
1/2 round stone tile trim to finish the
edges.

The bathroom tile flooring is a 18x18
limestone set in a diagonal pattern with
glass tile inserts. The shower floor was
tiled in a travertine mini Versailles pattern
with a honed finish.

All of the tile edges were bullnosed and
the entire job was sealed with a limestone
impregnator.
The bathroom remodeling project was
stopped at about the midway point.

Instead of trying to work with the
remodel job that had already been
done we decided that the best course
was to remove the tile installation all
the way to the framing.

This was important since the tile
installer/remodeling contractor failed to
install a new shower pan and drain.
Shower pan installation with travertine tile Broomfield,CO
Limestone tile flooring with glass tile inserts Broomfield CO
Limestone shower tile with glass tile liner Broomfield,Colorado
Shower tile was torn down to the studs for new shower pan and tile installation
Sharp uneven tile edges along all the shower corners.
Tile was installed over existing shower floor and curb.No new shower pan and drain was installed.
Tile lippage throughout the tile work, needing to be redone
No tile trim was used to finish the tile installation job.
Broomfield bathroom remodel using 12x12 limestone tile and glass tile liner
There was tile lippage throughout the tile
flooring and shower. With so many problems
in this bath remodel it was best to start all
over. New plumbing and shower drain was
installed for the new
shower pan liner.
We support Broomfield businesses like:

Dal Tile
8835 West 116th Circle
Broomfield, CO 80021
McAdams Plumbing
6343 W 120th Ave Ste 102
Broomfield, CO 80020
Code Blue Tile & Carpet Cleaning
465 Alter Street
Broomfield, CO 80020
Floor Visions
Dustless Hardwood Floors
12931 Prince Cir
Broomfield, Colorado 80020
A TILE NATION Kitchen Bathroom Remodel Design Installation
For an appointment that
is convenient for you call:
Kathleen 720-436-5808
info@atilenation.com
________________________________________________________________________________
REMODEL DESIGN INSTALLATION
A  TILE  NATION
720-436-5808
Broomfield Bathroom Remodeling